Difference between revisions of "User:NathanLaughlin4"
m |
|||
Line 1: | Line 1: | ||
− | + | Matters include approaches utilized in manufacturing planning and timing, and their integration with the managerial objectives of the agency; as well as ideas used by engineers to measure and improve productiveness, including job evaluation, mission. |
Revision as of 00:17, 28 October 2018
Matters include approaches utilized in manufacturing planning and timing, and their integration with the managerial objectives of the agency; as well as ideas used by engineers to measure and improve productiveness, including job evaluation, mission.